Documentation  >  Investigation Reports  > 

Damage Responsibility Detail

The Damage Responsibility Detail report provides detailed information about investigations.

The Damage Responsibility Detail report screen is shown below:

Damage Responsibility Detail Report Screen

Parameters

  • Damage Date
  • Region - only data from the selected region will be included the report. If a region is not specified, data for all regions will be included.
  • Customer Region - only data from the selected customer region will be included the report. If a customer region is not specified, data for all customer regions will be included.
  • Manager - all users listed below the user chosen, in the user hierarchy, will be included in the report.
  • Sort By - the report can be sorted by Investigator or Region.

The Damage Responsibility Detail report contains the following fields:

  • Claim# - claim number.
  • Region - region in which the damage occurred.
  • RMIR - investigation number.
  • Damage Dt - date when the damage occurred.
  • Address - address of the damage.
  • Utility - damaged utility.
  • Excavator - who was excavating the site.
  • EMP# - employee number of the locator.
  • Locator - name of the locator.
  • Ticket# - ticket number as specified in the transmission from the call center.
  • Pics - number of pictures attached to the Investigation and the relevant ticket.
  • Reason - reason for the damage.
  • Responsibility - who was responsible for the damage.
  • Rec'd Dt - date when the invoice was received.
  • Invoiced - the invoiced amount for the damage.
  • Paid - actual amount paid for the damage.
  • Estimate - estimated cost of the damage.
  • Status - current status of the investigation.
  • Facility Type - the type of facility that was damaged. This field is only included in the CSV version of the report. The report section describes how to produce a CSV report.
  • Facility Subtype - the specific, subtype of factility that was damaged. (This field is only included in the CSV version of the report. The report section describes how to produce a CSV report.

A sample Damage Responsibility Detail report is shown below: